How we deliver: One standard. Every development.

Every Vital development follows the same seven-stage standard — from the first plan to a documented handover. It is how we work on site, and what you can expect in every proposal.

The Vital New Build Standard™

Seven stages, each closed by a quality gate — applied the same way on every development we deliver.

PlanSurveyBuildInstallTestConnectHandover

Vital Telecom technicians working on a new-build residential street
One method on every developmentOne standard. Every development.

02Why a standard

Every site is different. The way we deliver it isn’t.

Two Vital Telecom technicians working on an open street cabinet on a new-build estate
Vital Telecom engineer working on fibre cables inside a street cabinet

New-build sites change from phase to phase. The method shouldn’t. A fixed standard gives everyone on the development the same picture of what happens next, who does it and what gets handed over.

  1. 01

    The same sequence on every site

    Seven stages in a fixed order, so developers, operators and contractors always know what comes next.

  2. 02

    A gate at every stage

    Each stage closes with a check before the next begins, so issues are found early — not at handover.

  3. 03

    Evidence you can hand on

    RAMS, test results and as-built records are produced as the work happens, ready for your team and the operator.

03The method

The Vital New Build Standard™

One standard. Every development. Select a stage to see the work, the deliverables and the gate that closes it.

Team reviewing duct route drawings
Stage 01 of 07
01 / 07GateScope agreed before survey

Plan.

Understand the development, then plan fibre into it.

We start with your site plans, phasing and programme, and agree how fibre fits in before anything is fixed.

What we do

  • Review plans, phases and programme
  • Assess connection options and capacity
  • Agree scope with every party

What you get

  • Agreed scope
  • Programme input
  • Connection approach

Developer · network operator · Vital delivery team

04At a glance

The whole method, on one page.

Every stage, what it delivers and the gate that closes it — open a row for the detail, or scan the sheet as it appears in our proposals.

The Vital New Build Standard™

7 stages · 7 gates

  1. Gate: Scope agreed before survey

    What we do

    • Review plans, phases and programme
    • Assess connection options and capacity
    • Agree scope with every party

    What you get

    • Agreed scope
    • Programme input
    • Connection approach

    Developer · network operator · Vital delivery team

—In proposals

“The Vital New Build Standard™ is Vital Telecom’s seven-stage method for delivering fibre infrastructure on new-build developments: Plan, Survey, Build, Install, Test, Connect and Handover. Each stage closes with a quality gate, so every development moves from agreed scope to a live, tested network with a complete handover record — one standard, applied on every site we deliver across the UK and Ireland.”
Discuss the standardThe Vital New Build Standard™

06Start a conversation

Bring the standardto your site.

Tell us about your development and we’ll show you how the Vital New Build Standard applies to it, stage by stage.